Narmadeshwar Temple, Mandal Valley

Currently accepting domestic contributions from India only. International contributions are not being accepted at this stage.

Mandal Valley in Uttarakhand at sunrise, with a small stone temple on a forested ridge beneath Himalayan peaks

Mandal Valley · Beneath Tungnath · Uttarakhand

Help Build Narmadeshwar Temple in Mandal Valley

Join us in creating a peaceful Shiva temple in Mandal Valley, beneath the sacred Tungnath region of Uttarakhand.

Campaign progress

₹0 of ₹6,00,000

0%

Construction progress

Target
₹6,00,000
Raised
₹0
Remaining
₹6,00,000
Donors
0

Every contribution will be documented and used solely for the temple construction project.

Our Mission

A modest temple for a quiet Himalayan valley

Mandal Valley is situated in the spiritually significant Himalayan region beneath Tungnath. The objective of this initiative is to construct the Narmadeshwar Temple, a simple Shiva temple, that can serve local residents, devotees and visitors as a peaceful place for worship, prayer and meditation.

The temple is planned as a modest single-storey structure with a sanctum for the Shivling, a small internal circumambulation path, a prayer area and a simple traditional exterior. Materials will be sourced locally wherever possible, and the work will be carried out in stages as funds are received.

The estimated construction cost is approximately ₹6,00,000.

“Your contribution, whether small or large, can help turn this community-supported vision into reality.”

Why this temple matters

A peaceful place of worship

A quiet sanctum where residents, devotees and visitors can pray and sit in silence.

A spiritual space for local residents

The nearest temples are a long walk away for elderly villagers, especially in winter.

Preservation of local tradition

Built in a simple traditional Garhwali stone style, in keeping with the valley.

A community-supported initiative

Land, volunteer labour and local coordination are contributed by the village itself.

Project Plan

Proposed temple design

Indicative drawings prepared for the committee. The final construction may vary slightly according to site conditions and mason recommendations.

Floor plan
3D temple model
Front elevation
Interior view
Ceiling design
Construction map

Budget

Where the funds will go

Estimated allocation prepared with a local mason and material supplier. Values are indicative and will be replaced with actual expenditure as work progresses.

Foundation and civil work

₹1,20,000

20%

Walls and roof

₹1,30,000

22%

Flooring and stonework

₹70,000

12%

Sanctum and Shivling platform

₹60,000

10%

Electrical work and lighting

₹30,000

5%

Doors, finishing and painting

₹45,000

8%

Transportation of material

₹50,000

8%

Labour charges

₹65,000

11%

Contingency

₹30,000

5%

Construction

Construction milestones

Each stage is updated with its status, date, photographs and completion percentage as the work proceeds.

  1. Stage 1

    Site preparation

    Completed

    Site cleared and levelled, material access path prepared.

    100%· 30-07-2026
  2. Stage 2

    Foundation work

    In progress

    Foundation stage work is currently underway at the site.

    10%· In progress
  3. Stage 3

    Wall construction

    Not started

    Stone masonry walls for the sanctum and prayer area.

    0%· Planned
  4. Stage 4

    Roof and ceiling

    Not started

    Slab casting and traditional ceiling detailing.

    0%· Planned
  5. Stage 5

    Sanctum development

    Not started

    Shivling platform, sanctum finish and circumambulation path.

    0%· Planned
  6. Stage 6

    Flooring and finishing

    Not started

    Stone flooring, plaster and exterior finishing.

    0%· Planned
  7. Stage 7

    Electrical and lighting

    Not started

    Basic wiring, lamps and sanctum lighting.

    0%· Planned
  8. Stage 8

    Final completion

    Not started

    Cleaning, final inspection and handover to the committee.

    0%· Planned

Transparency

Fundraising progress

Only verified contributions are included in these totals. Figures are updated by the committee and reconciled with the bank statement.

Fundraising goal

₹6,00,000

Contributions received

₹0

Number of donors

0

Spent from public donations

₹0

Available donation balance

₹0

Construction progress

Project commenced

30-07-2026

Last updated

09-08-2026

Fundraising progress towards the goal

0%

Construction progress

This fundraising campaign is newly launched. Temple construction has already reached approximately 10% progress through work undertaken prior to the public fundraising launch. Website donation figures will be updated only after verified contributions are received.

Daily construction progress

What happened on site, day by day

Dated site records with photographs, videos and documents, the amount spent, the running total, the balance in hand and the work planned next.

Live project updates enabled

Donor & team portal

Construction updates will appear here as they are verified and published by the project team.

From the construction site

Construction Progress — From the Site

Real photographs from the Narmadeshwar Temple construction site in Mandal Valley, Uttarakhand.

Site photographs will appear here as they are verified and published by the project team.

Detailed construction updates and project records are available to verified contributors through the Donor & Project Team Portal.

Documents

Project documents

Verified documents and project information for the Narmadeshwar Temple Construction Project.

Project Dossier

Narmadeshwar Temple Construction Dossier

Version 1.0 · August 2026

PDF Document

Official project dossier containing the project vision, construction plan, architectural information, estimated project costs, current fundraising campaign, transparency framework, donation information and project contact details.

Verified Project Document

Administrator privacy notice

Before uploading any document, mask Aadhaar numbers, personal signatures, bank balances, personal addresses and any identity-document numbers. Do not publish personal data of donors, committee members or landowners.

Accountability

Transparency commitments

  • Contributions will be used only for the stated temple construction project.
  • Verified donation records will be maintained.
  • Construction progress will be updated regularly.
  • Expenditure summaries will be published.
  • Donor information will not be displayed publicly without consent.
  • Payment confirmation is subject to verification.
  • International contributions are not currently accepted.

Currently accepting domestic contributions from India only.

Currently accepting domestic contributions from India only. International contributions are not being accepted at this stage.